riverlkp.blogg.se

Brick rigs steam workshop
Brick rigs steam workshop












brick rigs steam workshop

The definitions for the items of plant listed above can be found in schedule 19 of the Work Health and Safety Regulation 2011.

  • mobile cranes with a rated capacity of greater than 10 tonnes.
  • gantry cranes with a safe working load greater than 5 tonnes or bridge cranes with a safe working load of greater than 10 tonnes, and any gantry crane or bridge crane which is designed to handle molten metal or Schedule 11 hazardous chemicals.
  • amusement devices covered by Section 2.1 of AS 3533-Amusement Rides and Devices.
  • work boxes designed to be suspended from cranes.
  • hoists with a platform movement exceeding 2.4 metres, designed to lift people.
  • brick rigs steam workshop

    lifts, including escalators and moving walkways.tower cranes including self-erecting tower cranes.

    brick rigs steam workshop

  • gas cylinders covered by Part 1.1 of AS 2030.1 Gas cylinders-General Requirements.
  • pressure equipment, other than pressure piping, and categorised as hazard level A, B, C or D according to the criteria in Section 2.1 of AS 4343 Pressure equipment-hazard levels.
  • You will need to ensure that plant design registration information is available when it is supplied if you are designing, manufacturing, supplying or using: Part 1 of Schedule 5 of the Work Health and Safety Regulation 2011 requires certain plant designs to be registered. Plant design registration and plant registration are authorisations under Part 4 of the Work Health and Safety Act 2011. The registration holder must provide the design registration number with each item that is supplied. Once the design is registered, any number of items can be supplied as long as it complies with the design that was registered. The designer or the person with management or control of the item of plant can apply to to have a design registered. You can read about who has obligations under the Regulation.ĭesign registration ensures that plant listed in Schedule 5 of the Regulation is designed and verified to appropriate technical standards prior to being supplied. You must register certain types of plant design under the Work Health and Safety Regulation 2011 (the Regulation).














    Brick rigs steam workshop